ARTECH DESIGN STUDIOAKITEKHAS DESIGN STUDIO

About

Pahang AI Training Data Center Campus in Kuantan, planned for a 1GW IT Load with on-grid power and an off-grid captive plant.

Pahang · Kuantan

AI Training Data Center Campus

The Pahang campus is planned as an AI Training Data Center Campus with a 1GW IT Load.

Its power strategy combines on-grid power with an off-grid captive plant.

1GW
IT Load
AI Training
Data Center Campus
On-grid
Power
Off-grid
Captive Plant
Conceptual evening view of the proposed Pahang data-centre campus