About
Pahang AI Training Data Center Campus in Kuantan, planned for a 1GW IT Load with on-grid power and an off-grid captive plant.
Pahang · Kuantan
AI Training Data Center Campus
The Pahang campus is planned as an AI Training Data Center Campus with a 1GW IT Load.
Its power strategy combines on-grid power with an off-grid captive plant.
- 1GW
- IT Load
- AI Training
- Data Center Campus
- On-grid
- Power
- Off-grid
- Captive Plant
